What clients say
The right man
for the job
“In 2019 we were starting the Ariana Grande Sweetener World Tour. The entire production of the show was based around an extremely complicated video system that had never been used before in the touring world! The deployment of this system required the absolute best video technicians that could be found. No cost or distance was to be spared when it came to the production for the show.
We scoured the world and landed on one man to lead this video department, Peter Tilling.
At the hands of Mr. Tilling, we were able to navigate the complicated video system and produce a show that was of the highest caliber. Without Mr. Tilling’s hard work and extensive knowledge of video systems, we could safely say, there would have been no tour! The hundreds of thousands of fans that saw the Sweetener tour owe Mr. Tilling a debt of gratitude for his hard work, dedication and knowledge that led to a flawless performance, night after night.
Zito Production Manager
Ariana Grande Sweetener World Tour